9/27(三)至10/1(日)總圖前廳二至四樓玻璃圍欄工程施工,施工期間將於1樓前廳設置圍籬,禁止人員進入圍籬內以維安全。施工期間聲響難免,造成不便,敬請見諒。
圖書館行政組 謹啟
發佈日期:112/09/20
[Notice]
On 9/27(Wed.) to 10/1 (Sun.), there will be a glass railings construction on the second to the fourth floor in the atrium of Main Library .To ensure safety, barricades will be set up in the atrium on the first floor during construction, and users are prohibited from entering inside the barricades.
Noise might be generated during the period. We apologize for any inconvenience this may cause. Thank you for your cooperation.
Administration Division,
National Taiwan University Library
Email:libexe@ntu.edu.tw
TEL:(02) 3366-2300
Posted on Sep. 20th, 2023