[Notice] The Main Library will be under constructions from May 29th (FRI.) to June 5th (FRI.)
The constructions for electronic control would be operated in Main Library recently. The first phase will be started from May 29th (FRI.) to June 5th (FRI.). Please see the information below:
Period of Construction | Area of Construction | Service Interruptions during the Construction Period |
5/29 | Electrical room on each floor | There will be noise in library. |
6/1 to 6/3 | 2F |
There will be noise in library. |
6/4 | 2F |
Main 2F (including study carrels and discussion rooms) will be closed. If you need books which are located on 2F, please borrow them in advance. There will be noise in library. |
6/5 | 2F |
Study carrels 230-1 to 230-4, 245-1 to 245-5 and 249-1 to 249-4 and the reading area around there will be closed. Other areas on 2F remain open. There will be noise in library. |
Please see the latest announcement for further information about constructions.
Thank you for your cooperation!
Reader Services Division, NTU library
Mail : tulcir@ntu.edu.tw
TEL : 3366-2353